导航:首页 > 污水知识 > 污水车英文

污水车英文

发布时间:2021-02-07 10:07:02

⑴ 环保型汽车的英文怎么说

环保型汽车的英文
环保型汽车
environment-friendly car;
eco-friendly car

⑵ 求车的英文名称

beetle car甲壳虫
container lorry集装箱的大车

⑶ 一些常用的汽车类英文缩写

ABS(Anti-lock Brake System)即“防抱死制动系统”,能有效控制车轮保持在转动状态,提高制动时汽车的稳定性及较差路面条件下的汽车制动性能。

EBD的英文全称是Electric Brakeforce Dis-tribution,中文直译就是“电子制动力分配”。自动调节前、后轴的制动力分配比例,提高制动效能(在一定程度上可以缩短制动距离),并配合ABS提高制动稳定性。

CBC弯道自动控制(CBC)。在车辆转弯制动时,CBC与防抱死系统(ABS)配合工作,从而减小过度转向和转向不足的危险。即使在恶劣的驾驶条件下,亦能确保汽车的稳定性。有些高版本的ABS系统中包含CBC功能。

MSR(Motor control Slide Retainer) 发动机阻力矩控制系统。在某些特殊情况(在高速时换档或在低附着系数路面上行驶时突然松开油门)下发动机会产生较大的阻力矩导致车辆不稳定,这时MSR能自动降低发动机阻力矩,保证车辆行驶的稳定性。是防止发动机突然出现较大阻力后驱动轮路面附着系数突然下降的功能,比如你在雪地里,突然收油,MSR会控制发动机不让牵引力太快下降,保证车辆行驶稳定性。

TCS,其英文全称是Traction Control System,牵引力控制系统,又称循迹控制系统。是根据驱动轮的转数及传动轮的转数来判定驱动轮是否发生打滑现象,当前者大于后者时,进而抑制驱动轮转速的一种防滑控制系统。它与ABS作用模式十分相似,两者都使用感测器及刹车调节器。

ESP(丰田+雷克萨斯称为:VSC,BMW称为:DSC, VOLVO称为:DSTC):是由奔驰汽车公司首先应用在它的A级车上的。ESP实际上是一种牵引力控制系统,与其他牵引力控制系统比较,ESP不但控制驱动轮,而且可控制从动轮。如后轮驱动汽车常出现的转向过多情况,此时后轮失控而甩尾,ESP便会刹慢外侧的前轮来稳定车子;在转向过少时,为了校正循迹方向,ESP则会刹慢内后轮,从而校正行驶方向。

⑷ 请问机场的清水车、污水车用韩语怎么说

你好!译文如下袭:
标准/规范中文名: 【飞机清水车】
标准/规范韩文名: 【항공기 화물차】
标准/规范英文名: 【Aircraft potable water vehicle】

标准/规范中文名: 【飞机污水车】
标准/规范韩文名: 【항공기 폐수차】
标准/规范英文名: 【Aircraft sewage disposal vehicle】

⑸ 汽车英文翻译 FILLD WASHER FLUID

FILLD WASHER FLUID指的是填充洗涤液

相关介绍:

填充洗涤液,即玻璃水,属于汽车使用中版的易耗品。 优质的汽权车挡风玻璃水主要由水、酒精、乙二醇、缓蚀剂及多种表面活性剂组成。按性状分类可分为固体玻璃水和液体玻璃水。其中固体玻璃水大多为0℃以上环境使用。

车窗净是由多种表面活性剂及添加剂复配而成。表面活性剂通常具有润湿、渗透、增溶等功能,从而起到清洗去污的作用。

(5)污水车英文扩展阅读

玻璃水还应该具备对挡风玻璃和雨刮器的保护性能。也就是说,在正常使用过程当中对车辆进行保护与护理。一些品牌玻璃水通过调配多种表面活性剂及添加剂,独具修复挡风玻璃表面细微划痕的作用,通过形成独特的保护膜,以达到对挡风玻璃的全面呵护。

水的状态除了气态,液态,固态外,还有玻璃态。它是由液态水急速冷却到165K时形成的。当过冷水继续过冷,若其温度达到-110℃,它就变成了一种极端粘滞的固体,这就是玻璃水。玻璃水在由固态变为液态,由液态变为固态时,过程中没有明显的体积变化。且密度与普通液态水的密度相同。

⑹ 关于污水处理的原版英文 带翻译的 急需

DSTE型生活污水处理设备

使





一、 用途与适用范围
本设备主要适用于处理一般生活污水或与之相类似的工业有机污水。如:饭店、疗养院、学校、住宅区、工矿企业等生活有机污水处理。
二、 处理工艺
SWZ系列污水设备处理工艺,其主要处理工艺是采用目前较为成熟的生物膜法污水处理设备,对处理氨氮指标较为成熟。水质设计参数按一般生活污水水质设计计算,按进水平均BOD5:≤250mg/L,出水BOD5:≤20mg/L,进水平均CODcr:≤400mg/L,出水CODcr:≤100mg/L,进水平均NH3-N:≤40mg/L ,出水NH3-N:≤15mg/L ,进水平均SS:≤300mg/L, 出水SS:≤70mg/L,进水平均动植物油≤40mg/L,出水动植物油≤10mg/L,主要工艺路线如下:
厨房污水

污水入流

垃 事 达
圾 故 标
清 旁 回流 排
运 通 放
上 清 液

设备沉淀池为竖流式沉淀池,沉淀上升流速为0.4—0.8毫米/秒,接触氧化填料采用立体弹性填料,填料比表面积300m2/m3,供氧量按BOD5,NH3-N精确计算,曝气时间6—8小时。
缺氧池停留时间2—3小时,缺氧后的污水经接触氧化后,混合液回流缺氧池,回流比例根据调试确定(回流比100—200%)沉淀池停留时间1.5—2小时以上,沉淀池污泥气提至污泥池好氧消化,上清液回流调节池重新处理,污泥贮存污泥池由环卫部门定期清理。

三、 接管外形图及设备安装
1、本设备具有三种安装形式:一是安装在地表以下;二是一
半埋在地坪以下,一半在地坪上;三是全安装在地坪以上。基础必须水平,如设备安装在地坪以下,基础离地坪相对高度按图尺寸为准,同时四周挖掘宽度,长度必须离基础边线500mm以上,以便管道安装。
2、管道安装连接应该在设备就位时考虑好,设备就位时必须
按说明书设备自重,配合吊车吨位大小,安装顺序按现场对照图就位、管道连接附管道安装图一份,设备就位后连接管道用橡皮垫及螺丝紧固好,使连接处不渗漏。
3、根据安装图,设备的位置,方向不能放错,互相间距必须
正确。
4、安装完毕后设备与基础地板必须连接固定,绝对保证不使
设备流动上浮,全部安装完毕必须把设备存满水。试验各管路口必须不渗漏,同时设备不受地面水上涨,而使设备错位和倾斜。
5、设备安装完毕无不妥后,即可用土填入设备四周的间隙中
并整平,地面填土时应注意:⑴设备人孔盖板必须高出地坪100mm左右;⑵不能让土堵塞人孔盖板上的进气口。
6、把电控柜控制线与设备接通,接线时注意风机及潜污泵电
机的转向。控制柜不能放在露天,须防日晒,雨淋等。以免控制板及接线头漏电,烧毁控制板。
7、注意事项:⑴设备安装之处必须保证下雨不积水,⑵设备
的出水管必须在相对地坪0.4m以下,⑶设备上方不得压有重物,不得有大型车辆经过(指无特殊设计的),⑷设备一般不得抽空内部污水,以防止地下水把设备浮起。

四、 设备使用前检查及设备启动
1、启动设备前检查好电路,接线控制柜线路是否正确,电压
及电流是否符合要求。该设备控制柜为现场控制柜。本控制柜可同时控制若干台潜污泵、风机,并结合工作情况实时监测,具有自动保护报警功能,还配有手动,自动控制系统,启动水泵时检查水泵管路是否有渗漏及吸水,有无堵塞。
2、本设备水泵采用抗堵塞撕裂型潜污泵,其中二台水泵的控
制由微机通过检测污水池中的液位来完成,当液位由低到高到达工作水位时,启动工作泵,如液位继续上升到警戒水位时,再启动备用泵,即二台同时工作,当液位下降到工作水位时关掉工作泵,(液位通过液位开关来检测),启动风机时检查旋转方向是否正确,切忌反转。
3、当调节池污水较少,液面低于水泵启动液位时,二台水泵
都停止工作。这时,为使生物膜正常生长,风机间歇启动,启动时间在30分钟内任选、间歇启动周期为2小时内任选。
4、沉淀池排泥控制采用电磁阀气提排泥,排泥周期为2小时/次,排泥时间5—8分钟/次。
5、设备控制中心在微机柜上按照设计编排工作程序一次完
成(无特殊情况下不得采用手动控制方式),手动控制通过面板上按键开关,由人工控制潜污泵、风机、电磁阀及二氧化氯发生器等设备的开启和关闭。

五、 生物膜的培养
1、污水按额定流量不断进入设备内。
2、启动潜污泵、风机、电磁阀及二氧化氯发生器,风机的充
氧量减至正常充氧量的一半左右。
3、每天观察好氧池内填料情况,如填料上长出橙黄色或橙黑
色的一层粘状物,即已培养好生物膜,这个过程一般要7—15天完成。
4、气温一般在摄氏15℃—25℃最为适宜。
5、如原污水浓度太低,培养生物膜时间太长,必要时要加一
点营养,主要以粪便为主或其它。
6、PH值一定要保证6~9之间,原污水要保证达到可生化状
态。
7、开始调试时,生活污水少量进入生活污水处理系统,待生
物膜培养好后,生活污水可按正常流量不断进入生活污水处理系统,即调试正常开始。

六、 设备运行管理
1、将风机调至正常状态;
2、好氧池混合液回流比调至最佳状态;
3、按设计运行程序工作,经常观察生物膜的生长情况。

七、 维护保养及故障排除
1、必须注意污水中不得有大块固体物质进入设备,以免堵塞
管道与孔口和水泵损坏;
2、设备人孔必须盖好,以防发生意外或掉入大块固体物质;
3、进入设备的污水PH值必须在6~9之间,偏酸偏碱会影响
生物膜的正常生长;
4、风机一般运行6个月左右需要换机油一次,以提高风机使
用寿命;
5、必须保证风机进气口畅通。
6、故障排除
故 障 原 因 排 除
污水流动不畅 管路或孔口有杂物堵住 用压力水或压缩空气冲刷
曝气量不足 进气口有异物堵塞 清理异物
混合液回流不畅 管道内有异物或阀门堵死 旋开阀门,用压力水冲洗
污泥提升不畅 管道内有异物或阀门堵死 旋开阀门,用压力水冲洗

DSTE TYPE DOMESTIC SEWAGE TREATMENT EQUIPMENT

OPERATION INSTRUCTIONS

Operation instructions to the DSTE
I Use and scope
This set is mainly used to treat the domestic sewage or some kind of instrial waste water, such as the waste water from the restaurant , sanatorium, or school, etc.
II. Treatment Technology
This DSTE set is mainly adopt the method of the Biomembrane method to deal with the waste water, it is a quite mature method to remove the NH4-N content in the water nowadays, the parameter of the water quality is designed according to the waste quantity containing in the raw water:
Waste intake average parameter
BOD5≤250mg/l
CODcr≤400mg/l
NH3-N≤40mg/l
SS≤300mg/l
Grease≤40mg/l
Effluent average parameter
BOD5≤20mg/l
CODcr≤100mg/l
NH3-N≤15mg/l
SS≤70mg/l
Grease≤10mg/l
The main treatment technology flow is as follow:

Kitchen sewage Oil interceptor

Intake of the sewage Bar rack Retention pool Anaerobic tank

sludge recycle

Contact oxidation tank Sediment tank disinfection tank

To disposal sludge tank
The sediment tank is erect style tank, the up-flow velocity is 0.4---0.8mm/s, contact oxidation material is stereoscopic and elastic, the specific surface area of it is 300m2/m3, the O2 supply is designed according to the BOD5 and NH3-N content in the water, and the aeration period will be 6~8 hours.
The time for waste water stay in the anaerobic tank is 2-3 hours, after contact oxidation, the waste water and sludge backflow to the anaerobic, backwater ratio is (100--200%) according to the adjustment. The time the waste water be kept in the sediment tank should more than 1.5~2 hours, sludge in the sediment tank will be exalted to the sludge tank by air waiting for the contact oxidation, then the overflow will backflow to the retention basin retreated, the sludge in the tank would be cleaned periodically.
III Installation
1.Three forms of installation: ⑴underground installation; ⑵half underground installation;⑶on the ground installation. The basement must be flat, if the set is installed underground, the height between the basement and the surface of the ground should adopt the drawing, and make the excavation width exceed 500mm out of the foundation plate , which is better for pipe installation.
2. Everything about pipe installation and connection should be taken into consideration when the set is ready. Make sure the net weight is suit with the crane, and the installation sequence should adopt the designed drawing, tight the screws with the rubber washer so as to connect the pipes, make sure there isn’t any leaking in the conit joint.
3. The install direction and position should be correct, so do the interval between them.
4. Fix the set with the surface of the ground after the installation has been finished, make sure it is firmly fixed, and the set wouldn’t move in the future. Pour in water after finish installation to the full. Make sure there isn’t any leaking on the conit joint, and make sure the set wouldn’t in version or inclined because of rise of the water under the ground.
5. After correct installation, pour some soil into the interval and make it flat, make sure:
⑴ The cover of the manhole should higher than the surface for about 100mm;
⑵ The air intake pipe on the manhole wouldn’t be blocked by the soil.
6. Connect the electrical control wire with the set, pay attention to the running direction of the blower and the submersible sewage pump. The electrical control cabinet couldn’t be kept outdoor, because the sun or rain would destroy the control board.
7. Points of attention:
⑴ The place to install the set could not store up the water when it is raining, ⑵ The water outlet pipes should be 0.4m under the surface of the ground.
⑶ Make sure that there wouldn’t any heavy things on top of it, and no tracks would get through it.
⑷ There should always some waste water in the set to prevent the floatage of the set by the underground water.
IV Examine the set and start before use
Make sure the electrical wires, control panel wires and the voltage are all accord with requirement. The local control cabinet could not only be used to control submersible sewage pumps and the blowers at the same time, but also could monitor itself according to the working condition. It also have the ability to self protect and self alarm, beside that, manual switch and automatic exchange switch are also equipped. To examine the pipes of the pump before start to see whether it is seeping or bibulous or stifled.
The pump of this set is antiblock avusion type pump, the control of two pumps is through the liquid switch in the waste water basin, working pump start to work when the height raised to the start level; the spare pump start when the height raised to the highest level; pump stop working when the height fall to the low level. Check out whether the revolving direction of the blower is correct when it is started.
When the liquid level is lower than the pump starting height, both two pumps stop working. At this time, the blower start to work intermittently, working time should between 0~30 minutes, and the period of the intermittent start should between 0~2 hours.
The control of the sludge discharge in the sediment tank is air boost discharge by the electromagnetic valve, discharging cycle: 2hours/time, discharging time: 5~8minutes/time.
The control of the set should be finished according to the computer designed working procere one time, (only under some special conditions the hand –driven control could be used). If it is necessary, the manual control of the submersible sewage pumps and the blowers and the electromagnetic valve can be realized through turning the switch on or off by hand.
V. The cultivation of the biomembrane
1. The quantity of sewage which entering in the set should accord with the rated flux with no stop.
2. The oxygen volume from the blower should reced to half amount when starting the submersible sewage pump, blower, electromagnetic valve and the CLO2 generator。
3. Observe the material filled in the contact oxidation tank, the biomembrane has finished when a piece of yellow or black dope could be found on the surface. The process costs 7~15 days.
4. The best temperature should be: 15~25℃
5. If the density of the original sewage is to low, it would cost more time to cultivate the biomembrane, so when it is necessary, some kind of furtilizer should be added.
6. The pH value should be kept between 6 and 9, so that the original sewage could reach the step of contact oxidation.
7. When start, pour in small quantity of sewage into the sewage treatment system. After the bilmembrane is finished, Sewage could enter in the system in normal flux.

VI. The management of the operation
1. Turn the blower to the normal position.
2. Let the backflow ratio of the contact oxidation tank reach the best position.
3. Working as designed, often observe the cultivative situation of the biomembrane.
VII. Maintenance and fix the breakdown
1. Make sure that there wouldn’t any solid material content in the sewage, to prevent the block of the pipes.
2. Cover the manhole of the set so as to prevent the droping of some solid material.
3. The pH value should be kept between 6 and 9, in order to keep a better condition for cultivation.
4. Change the lubricating oil in the blower one time every six months.
5. Keep the entrance of the blower unblocked.
6. Fix the breakdown
fault reason method
No enough water flow Sth. block in the pipe Clean by pressure water or air
No enough aeration volume Sth. block in the entrance of the blower Clean it
No enough refluence of the mix liquid Sth. block in the pipe or entrance of valve Unscrew the valve, clean it by pressure water
No enough refluence of the sludge Sth. block in the pipe
or entrance of valve Unscrew the valve, clean it by pressure water

⑺ 车的英文是什么

什么车
轿车是car
还有卡车truck/lorry
公共汽车/巴士
bus
越野车
等等

⑻ 污水 英文怎么说

Sewage

⑼ 各种车的英文



n. car, vehicle, machine,
wheeled machine, lathe, turn, castle, rook

⑽ 各类车型的英文

1、sedan 大轿车,厢式轿车;

这个英文单词指普通的轿车车型,也就是马路上现在最为常见的四门轿车。这种车型的名字在英语中是Saloon,在美语中为Sedan。

2、hatchback 掀背式汽车;

掀背车(Hatchback)是汽车车身设计的一种形式,除了二到四个侧开的车门之外,尾部通常会有一个垂直的尾门(如标致307)或一个倾斜的尾窗门(如马自达6掀背版),以打开行李舱,是此类车重在外观上的主要特色。



3、Station Wagon 客货两用车;

wagon (瓦罐)就是国人常说的旅行车。旅行车的优点显而易见,有着轿车的舒适性,并且有着SUV一样的大后备箱容积。

4、Fastback 斜背汽车;

顾名思义,即指线条非常快速流畅的后背部,有人也称之为“溜背型”或者“快背式”。而在汽车术语中,Fastback 意指那种车顶轮廓线呈流线型一直连贯至车尾的设计。

5、SUV 运动型实用汽车;

不同于可在崎岖地面使用的ORV越野车(Off-Road Vehicle的缩写);SUV全称是sport utility vehicle,或suburban utility vehicle,即城郊实用汽车,是一种拥有旅行车般的空间机能,配以货卡车的越野能力的车型。

阅读全文

与污水车英文相关的资料

热点内容
污水加盖 浏览:847
污水处理费免征增值税如何备案 浏览:433
家峰车载饮水机怎么样 浏览:930
中央净水器超滤哪个牌子好 浏览:690
乳化沥青蒸馏残留物测试仪 浏览:383
广东屠宰污水处理排放标准 浏览:327
污水厂如何减少c排放 浏览:873
反渗透工艺预处理方法 浏览:125
人接触到核废水会怎么样 浏览:785
什么饮水机好啊 浏览:283
树脂改件gk 浏览:357
脱硫废水除氨氮 浏览:480
净水器有两个滤芯怎么分开 浏览:857
污水井巡查检查标准 浏览:580
天涌泉净水器多少钱一台 浏览:753
污酸废水水量 浏览:900
雨水收集池回用系统方案 浏览:973
氨基酸阴离子交换树脂洗脱顺序 浏览:503
净水机双出水多少ppm 浏览:445
天津污水处理厂英语怎么说 浏览:98